RFP - Preliminary Design and Environmental Services

This project will complete a .9 mile segment of the Bay Trail (10' wide paved trail with 2' shoulders), closing a gap in the trail between the northeastern end of the Pinole Point Business Park and the existing terminus of the Bay Trail located at Wilson Point in the Park District's Pinole Shores park in Contra Costa County. A portion of the trail will be located within a dedicated easement owned by the District, with in easement to be granted to the Park District through Union Pacific Railroad's (UPPR) right-of-way (ROW), and within a proposed easement through Contra Costa County Sanitary District's property (CC Sanitary District). A Memorandum of Understanding was signed between the Park District and UPRR in 2016 that calls for the trail to located within the outermost 15' of the UPRR's ROW and preliminary discussions are occurring on acquiring ROW from CC Sanitary District. A preliminary engineering study examining alignment opportunities and constraints, impacts of the trail, and costs to construct was completed in 2005 by Questa Engineering. This report is available for review on the Park District's website at: www.ebparksplanroom-rfp.com.

Status

Bidding Closed

Prebid Date2/8/21 11:00 am

Proposal Date2/26/21 5:00 pm

Company & Contacts

East Bay Regional Park District

Suzanne Wilson, swilson@ebparks.org  

Location

Point Pinole, Richmond, CA

NON-MANDATORY VIRTUAL PRE-BID MEETING ON MONDAY, FEBRUARY 8TH, 2021 @ 11:00 AM

PROPOSALS DUE ON FRIDAY, FEBRUARY 26TH, 2021 @ 5:00 PM